The conversion of our loft into a 3rd bedroom, which began about a year ago, is entering it's final stages. Yesterday it took a couple more steps towards final completion with the installation of closet doors and an entry door casing. Last week, the finishing drywall was done in the closet and everything was painted the final color. Then the carpet was put back down in the closet and entryway and the floor trim began to be reinstalled also. All that is really left is the installation of handles in the closet doors, and the installation of casing and stop around the closet doors. That will complete the inside of the room in entirety, leaving only the outside of the door frame in the hall to complete.